thank you for your answer. the issue is that i did not work in a chemical plant but i worked in the office but we also tested the materials and deeloped the collection. Did you also check the MSA booklet? theres proffessional engineer general description of role and it states:
Application of systematic engineering synthesis and design processes.
a)Proficiently applies technical knowledge and open ended problem solving skills as well as appropriate
tools and resources to design components,elements,systems, plant, facilities and/or processes
to satisfy user requirements.
b)Addresses broad contextual constraints such as social, cultural, environmental, commercial, legal political and
human factors, as well as health,safety and sustainability imperatives as an integral part of the design process.
c)Executes and leads a whole systems design cycle approach including tasks such as:
−determining client requirements and identifying the impact of relevant contextual factors,including
business planning and costing targets;
-systematically addressing sustainability criteria;
−working within projected development, production and implementation constraints;
−eliciting, scoping and documenting the required
−outcomes of the design task and defining acceptance criteria;
−identifying assessing and managing technical, health and safety risks integral to the design process;
−writing engineering specifications, that fully satisfy the formal requirements;
−ensuring compliance with essential engineering standards and codes of practice;
−partitioning the design task into appropriate modular, functional elements; that can be separately addressed and subsequently integrated through
defined interfaces;
−identifying and analysing possible design approaches and justifying an optimal approach
−developing and completing the design using appropriate engineering principles, tools, and processes;
−integrating functional elements to form a coherent design solution;
−quantifying the materials, components, systems,equipment, facilities, engineering resources and operating arrangements needed for implementation
of the solution;
−checking the design solution for each element and the integrated system against the engineering specifications;
−devising and documenting tests that will verify performance of the elements and the integrated realisation;
−prototyping/implementing the design solution and verifying performance against specification;
−documenting, commissioning and reporting the design outcome.
d)Is aware of the accountabilities of the professional
engineer in relation to the ‘design authority’ role.
This is excactly what I did, any adivice is welcome is that enough?