Jump to content

bigjohn

Members
  • Posts

    42
  • Joined

  • Last visited

Posts posted by bigjohn

  1. anyone knows what that mean by "your nominaiton and visa application were linked together"?

     

    employer's nom was submitted on 29th of Aug and my visa app was lodged on 16th of Oct. My employer called the Dept on Dec and got told they have been linked.

     

    does that mean they will be reviewed/granted(if it's Okay) at the same time???

  2. Hi Flappy,

     

    is that the most current one? if yes, it is unbelievable slow for Perth centre. here was the time frame that received on 5th Dec, 2012

    [TABLE]

     

    [TR]

    [TD=width: 189]

     

    Processing Centre

     

     

    [/TD]

    [TD=width: 189]

     

    ENS

     

     

    [/TD]

    [TD=width: 189]

     

    RSMS

     

     

    [/TD]

    [/TR]

    [TR]

    [TD=width: 189]

     

    Parramatta

     

     

    [/TD]

    [TD=width: 189]

     

    22 June 2012

     

     

    [/TD]

    [TD=width: 189]

     

    11 May 2012

     

     

    [/TD]

    [/TR]

    [TR]

    [TD=width: 189]

     

    Melbourne

     

     

    [/TD]

    [TD=width: 189]

     

    14 February 2012

     

     

    [/TD]

    [TD=width: 189]

     

    14 February 2012

     

     

    [/TD]

    [/TR]

    [TR]

    [TD=width: 189]

     

    Perth

     

     

    [/TD]

    [TD=width: 189]

     

    18 June 2012

     

     

    [/TD]

    [TD=width: 189]

     

    20 March 2012

     

     

    [/TD]

    [/TR]

     

    [/TABLE]

  3. I have the same situation as Tickled Pink. and have beening wating for 2 and half months already. no idea when it will come to a result.

     

    actually my plan is to get PR granted before taking an unpaid leave about 3 or 4 months. not sure if I can take it now without affecting the application..............strugling.........

×
×
  • Create New...